为了改变目前电网现场作业管理的变电巡检、变电检修试验、输电线路巡检检修等管理系统各自独立运行,信息不能共享,功能、效率受限,建设和维护成本高的现状,提出了采用B/S+C/S构架模式,将各现场作业管理模块和生产MIS(管理系统)集成为一体的现场作业管理系统的设计方案,做到各子系统和生产MIS软硬资源共享,做到同一数据唯一入口、一处录入多处使用。各子系统设备人员等基础信息来源于生产管理系统,各子系统又是生产管理系统的作业数据、缺陷信息的重要来源。经过研究试用成功和推广应用,目前该系统已在江西电网220 kV及以上变电站全面应用。 Abstract: In order to improve the status that the substation field inspection system, substation equipments maintenance and testing system, power-line inspection and maintenance system are running independent with each other. They can?蒺t share the resource information which accordingly constrains their functions and efficiency, and their construction and maintenance costs are high. This paper introduces a field standardized work management system based on B/S+C/S mode, integrating all field work management systems based on MIS and share the equipments and employee?蒺s data of MIS,the field work data of the sub systems are the source information of MIS, by which the same single data resouce with one-time input can be utilized in multiple places. After the research and testing, this system is triumphantly using in all 220kV and above substations in Jiangxi grid.